City Offices and Facilities Closed on Thursday, November 28, through Sunday, December 1 for Thanksgiving Holiday

Thursday, November 28, trash, food waste, and recycling routes will be collected on Wednesday, November 27. Friday, November 29, trash, food waste and recycling routes will be collected on Saturday, November 30.

Library Renovations Update 10/17: Changes to the Community Center/Recreation and Maple Avenue Trench Work Continues

The scheduling of demolition and construction timelines are pending weather.

Active Alerts
  • No results found for this search.
CLOSE SEARCH

Stormwater Resiliency Study

 

Purpose:

The City Council provided $150,000 towards a study of stormwater impacts on private property and management options. The City has partnered with the Low Impact Development Center (LIDC) for this initial effort. LIDC has performed stormwater impact analysis for several jurisdictions, including Somerset, Hyattsville, and Cheverly.

The Low Impact Development Center proposed Scope of Work includes:

Task 1 – provides a suite of stormwater management solutions for private and public property. It is envisioned that this will provide much-needed public information that the City can post to our website to help residents understand options for stormwater management.

Task 2 – Review flood-prone areas of the City and select approximately 20 locations to develop initial recommendations for addressing stormwater impacts. This analysis will use GIS information, satellite imagery, and field visits. Two of these locations will be studied in detail to illustrate the possible reduction in run-off volume through the implementation of the recommended measures.

Task 3 – Provide a list of proposed incentives and Code changes that the City may want to consider to enhance stormwater requirements, both at the City level and to recommend at the County level.

Task 4 – Establish a dashboard on the City’s website that will enable property owners to estimate the amount of run-off produced by various types of storm events based on the amount of pervious and impervious surface within their property. The dashboard will also include links to available city incentive and State grant programs.

For more information about the project, please contact:

Daryl Braithwaite
Public Works Director
Email Daryl

Takoma Park Site Visit Areas
Stormwater Resiliency Study Meetings
Stormwater Resiliency Study – 4th Community Meeting

Thursday, July 18, 2024

The Low Impact Development Center (LIDC) has completed their Stormwater Resiliency Study evaluation and recommendations. View the final report here: Stormwater Resiliency Study Final Report (PDF)

  • Meeting Overview: LIDC will present their overview and list of recommendations at a Zoom meeting on Thursday, July 18 at 7 pm
  • Virtual Registration: Zoom Webinar Registration Link
First Meeting Information

Thursday, November 10, 2022

The meeting will provide general information about the scope of the project and an initial review of the various data sources that the study will be using, as well as enable residents to provide input on identification of flood prone areas in the City.

Among the deliverables of the study include development of general information about a suite of stormwater management solutions for both private and public property that will be added to the City’s website.

The study will identify approximately 20 flood prone locations for further analysis, and two of the locations will be studied in detail to illustrate measures to reduce run-off. The LIDC will also provide the City with a list of proposed incentive and Code changes for consideration to enhance stormwater management requirements. Lastly, the project will provide a dashboard that will enable residents to estimate the amount of run-off on their property generated by various storm events.

Site visits:  (to be updated)

Area 1: Wednesday, January 18th

Area 2: Monday, January 23rd

Area 3: Monday, January 30th

Area 4: Wednesday, February 8th

Area 5: Monday, February 13th

 

Second Meeting Information

October 26th 2023

Review the Run Off Calculator

Watch the presentation: LIDC Run-Off Calculator Meeting 10-26

Introducing: Rainplan Stormwater Calculator

Click on the above image  to see an evaluation of your property and the stormwater run-off generated.

This tool created by Rainplan uses high resolution aerial imagery to calculate the amount of run-off a property generates based on impervious surfaces, tree cover and soil type.  The tool also provides detailed information about possible ways to manage and reduce stormwater run-off. Rainplan offers a no cost virtual site to further discuss stormwater management measures, implementation costs and available contractors.

Use this link to see an evaluation of your property and the stormwater run-off generated: https://app.myrainplan.com/listing_detail

Stormwater Resiliency Study – 3rd Community Meeting

Thursday, March 5, 2024 Meeting

The Low Impact Development Center has reviewed 20 flood-prone areas in the City and will present their evaluation of the sites and initial recommendations for addressing stormwater impacts.

 

Documents:

Work Session – City Council Meeting – July 13, 2022

LIDC Report Presentation

Quicklinks

Stormwater Management Program Sections